Business Problem:
There is a need to plan the mining of the lime stones mine so that there we can achieve consistent quality over a long period by properly blending the stone from different sections of the mine.
Project Description:
The project was to develop a software to help a mining engineer to plan for the long term and short term mining. The product consisted of three programs which allowed the mining engineer to input the data from drilling operations, study and analyze the mine deposits as well as simulate mining for the long term and short term periods. The software had 2D and 3D graphics so as to view the mine in various stages of simulation. It cuts down the time required by the mining engineer to plan the operations by over 90% as compared to the manual means
Technology included :Dos/QuickBasic
Company I worked For: NCB
Role : System Designer and developer
Team Size: 1
I designed and developed the system (May 93-Jan 94). Used in the following cement plants
1. M/s Naramade Cement Co Ltd.
2. M/s. Himachal Ambuja Cement Co.
3. Sheopura Kesarpura Limestone mines
I interacted with the mining engineer, to conceive, design and develop the whole application
This was a topic of a paper presented in the International seminar
There is a need to plan the mining of the lime stones mine so that there we can achieve consistent quality over a long period by properly blending the stone from different sections of the mine.
Project Description:
The project was to develop a software to help a mining engineer to plan for the long term and short term mining. The product consisted of three programs which allowed the mining engineer to input the data from drilling operations, study and analyze the mine deposits as well as simulate mining for the long term and short term periods. The software had 2D and 3D graphics so as to view the mine in various stages of simulation. It cuts down the time required by the mining engineer to plan the operations by over 90% as compared to the manual means
Technology included :Dos/QuickBasic
Company I worked For: NCB
Role : System Designer and developer
Team Size: 1
I designed and developed the system (May 93-Jan 94). Used in the following cement plants
1. M/s Naramade Cement Co Ltd.
2. M/s. Himachal Ambuja Cement Co.
3. Sheopura Kesarpura Limestone mines
I interacted with the mining engineer, to conceive, design and develop the whole application
This was a topic of a paper presented in the International seminar